Operations
Seven weeks from first commit to shipped
What shipping in seven weeks requires: scope decided before starting, a single owner, cuts treated as the work, market pressure ignored, and a post-ship review that compounds.
Tag
2 articles tagged with this topic
Operations
What shipping in seven weeks requires: scope decided before starting, a single owner, cuts treated as the work, market pressure ignored, and a post-ship review that compounds.
Mindset
Ship ugly does not mean ship broken. Linear, Basecamp, and Reid Hoffman all point to the same narrow target: minimum aesthetic, maximum function.